Your Zscaler deployment is now at Phase 2 (Initial Configuration)
View in browser
SD Banner Prepare for Launch
Continuum - Phase 2 Initial Configuration

Hi Friend, 

 

Your Zscaler deployment is now in Phase 2 – Initial Configuration.

Phase 2 is where the approved design from Phase 1 is implemented in the Zscaler platform and validated using a limited set of pilot users. The objective is to ensure the environment behaves exactly as expected before broader rollout begins.

 

Best regards,  
TBD | TBD

What Happens During Phase 2

During Initial Configuration, SecureDynamics focuses on building and validating the core components of your deployment:

  • Identity & Provisioning Configuration

    Integration of your identity provider (for example, SAML and SCIM), confirmation of group synchronization, and validation of authentication flows for both ZIA and ZPA.

  • ZPA Foundation & Application Access (If In Scope)

    Configuration required to onboard private applications, including identity alignment, access policy foundations, and App Connector readiness.

  • App Connector Deployment & Validation (If In Scope)

    Deployment of App Connectors in your environment, confirmation of connectivity to the Zscaler cloud, and validation of required DNS and network prerequisites.

  • Client Connector & Forwarding Configuration

    Baseline Client Connector profiles are configured to enable, where applicable, ZIA access/inspection and/or ZPA access—without broadly impacting users.

  • Limited Pilot User Testing

    A small set of pilot users is enabled to validate:

    • Authentication and provisioning behavior

    • Internet and SaaS access through ZIA (if applicable)

    • Private application access through ZPA (if applicable)

    • Policy behavior and user experience

      These pilot users are used strictly for technical validation, not full production rollout.
  • Baseline Policy & Inspection Readiness

    Initial policy configuration and inspection behavior are validated so that Phase 3 rollout can proceed predictably.

What to Expect During This Phase

  • Configuration and validation work occurring primarily in the background

  • Occasional targeted requests for input from your team

  • Pilot users experiencing early access while the environment is verified

Any issues identified during pilot testing are addressed before expanding access.

What We May Need From You

To keep Phase 2 moving smoothly, we may request:

  • Confirmation of pilot users and associated identity groups

  • App Connector hosting details and network prerequisites

  • Change window considerations or operational constraints

What Comes Next

Once Phase 2 validation is complete, we’ll move into Phase 3 – Traffic Rollout, where access is expanded in a controlled, phased manner using the validated configuration.

Need Help?

SecureDynamics Support:

https://cm360.securedynamics.net/support

 

Important: During active deployment projects, SecureDynamics does not provide a formal SLA for support tickets. However, our Zero Trust Success Managers (ZTSMs) will make every reasonable effort to respond quickly and, if needed, coordinate a short working session to assist.

Helpful Resources

  • Zscaler Deployment Advisor GPT – your interactive GPT guide for deployment sequencing, readiness validation, and early configuration insights.

  • SecureDynamics Knowledge Base – deployment and configuration references

Unlock More with #zboost

If you want deeper guidance on any deployment topic—such as connector design, policy structure, or advanced configuration—enter #zboost followed by your most questions directly in our custom GPT.

For example:

#zboost how do I configure SCIM for ZPA with Entra ID?

 

ZBoost instantly connects you to validated technical content, deployment playbooks, and design templates to help you go even further.

LinkedIn

https://cm360.securedynamics.net/phase2

SecureDynamics, 5201 Great America Parkway, Suite 320, San Jose, CA 95054

Unsubscribe Manage preferences